Research-development layer. Provisional and model-based. No hardware measurement exists; no physical advantage is claimed. Revision H is frozen and separate.
Original checkpoint file checkpoints/v0/docs/tetragon-map-v0.md, rendered here without any change to its text. The Markdown source is the authoritative copy (raw file). Later corrections are in Errata.

Tetragon transformation map, version 0

On this page

Status: working draft for review. Ideal-model mathematics only. Not part of Revision H and separate from pull request #1.

Evidence tags: DERIVED (checked by code/tetragon_map.py, ideal noise-free operations), PROPOSED (an idea or a test, not done), UNVERIFIED (supplied or remembered, and not checked), MEASURED (none exist). Physical cost fields are deliberately empty because no defensible apparatus parameters exist (audit item A02).

1. What was done

One Tetragon (polarization H/V by OAM -1/+1, index = 2*pol + OAM) was analysed in four parts. All four run in one stdlib program and print ALL PASS.

PartQuestionResult DERIVED
Bell familyFour maximally nonseparable states A=(00+11), B=(00-11), C=(01+10), D=(01-10), each over sqrt 2. Which operations move among them?Single-axis flips and phase flips give the table in the pasted review exactly, signs included. Of the 24 permutations of {A,B,C,D}, single-axis Clifford operations produce 4 and local Cliffords on both axes produce all 24. A controlled phase and a local S on both axes induce the same relabelling (A and B swap). The axis SWAP leaves all four labels fixed and flips one sign.
Either-axis controlDoes acting on polarization equal acting on OAM?For state A, a rotation R on polarization equals R-transpose on OAM. This is a property of that one maximally entangled state, not of the operations.
TimeDoes letting the photon's time bin choose the operation matter?With time bins in superposition, "no operation in slot 0, polarization flip in slot 1" creates 1 ebit between time and polarization. The same operation in both slots creates none, and a single definite slot creates none. So a classical schedule adds no entanglement, and time as a quantum control does.
Stabilizer basesWhat are the complete mutually unbiased bases (MUBs) in four dimensions?Of the 15 Pauli-stabilizer bases, 9 are product bases and 6 are maximally entangled. They form 6 complete MUB sets of 5 bases. Each set has 3 product and 2 entangled bases, and each basis lies in exactly 2 sets. The encoding basis and the Bell basis are in no common set (overlaps are 0 and 0.707, not 0.5).
Basis mapWhich operation class links each of the 225 ordered pairs of bases?See the table below.

Basis map (cheapest route found, searching single-axis Clifford, then local Clifford on both axes, then one controlled phase between local stages):

From → toPairsRoute
Product → product8145 single-axis, 36 local on both axes
Entangled → entangled36all single-axis
Product ↔ entangled108all need one entangling gate plus local operations
Total22581 single-axis, 36 local on both axes, 108 with an entangling gate

The single-axis count includes the 15 trivial pairs of a basis with itself.

2. How to read it

3. Hypothesis (PROPOSED)

A sequence of useful operations that stays within one entanglement class could avoid repeatedly establishing and removing entanglement, and might be cheaper than the same sequence done conventionally.

Stages: establish the entanglement structure, manipulate within it, convert when the computation requires. Mapping unordered bases is not executing logical operations, so this is untested. A fair test names the task, the baseline gate set and the metric before comparing (see docs/research-development.md, section 7).

4. Time

The clock means a classical schedule (Docked Scheduling, provisional name). A time bin in superposition selecting the operation is a quantum control register and is not what the schedule means. Reusing one component for successive photons adds no loss per photon. Sending one photon repeatedly through a component needs a return path or storage, and loss compounds: at 99% per pass, 100 passes transmit 36.6% (illustrative, not an apparatus figure).

5. Prior art (titles from a search; none of these has been read)

Marked UNVERIFIED. Relevance is inferred from the title only.

TitleReferenceWhy it may matter
General U(4) gate for photon polarization and orbital angular momentumarXiv:1012.2704Gates between the two axes of one photon
Single-photon two-qubit SWAP gate for entanglement manipulationquant-ph/0407136An axis SWAP; bears on the open device question in Volume 5
Deterministic Controlled-NOT gate for single-photon two-qubit logicquant-ph/0402208Entangling gate between axes of one photon
High-Dimensional Single-Photon Quantum Gates: Concepts and ExperimentsarXiv:1702.07299Already cited in the library at abstract level
Arbitrary unitaries in orbital angular momentum of single photonsarXiv:2106.11046OAM control
Measurements in two bases are sufficient for certifying high-dimensional entanglementarXiv:1709.07344Cost of verification; may mean fewer than d+1 bases are needed to certify dimension
Characterization of high-dimensional entangled systems via mutually unbiased measurementsarXiv:1212.5825MUBs in verification
On the role of entanglement in qudit-based circuit compressionarXiv:2209.14584Compilation and entanglement
OneQ: A Compilation Framework for Photonic One-Way Quantum ComputationarXiv:2209.01545Photonic compilation; entanglement as a persistent resource
Demonstration of a quantum C-NOT Gate in a Time-Multiplexed fully reconfigurable photonic processorarXiv:2412.02478Time multiplexing and component reuse
Multiplexed single-photon state preparation using a fibre-loop architecturearXiv:1503.03546Loop-based reuse

Reading: each interface PhaseKeep examines (gates between axes of one photon, certification cost, compilation, time multiplexing) already has work on it. No claim is made here that any intersection is unstudied, and novelty has not been established.

6. Limits

7. Next ideal-model study (PROPOSED)

Preserve ordered state mappings and relative phases. For each candidate operation record:

FieldValues
Works onone known state / a stated family / arbitrary allowed inputs
Preserves relative phasesyes / no / not checked
Effect on entanglementpreserved / changed
Axis control neededindependent / coupled / entangling
Equivalent alternativeslisted
Cost of entering and leaving the configurationlisted
Physical costempty until apparatus parameters exist

8. Pending

Independent numerical reimplementation (a different library), reading the sources in section 5, a literature check of novelty, and the abbreviation-conflict search. Docked Scheduling is a provisional proposed name and appears here only as described in section 4.